Acre estate homesite ready to build on! Wetlands survey is done and in the monitoring phase.
Water stubbed and vault in, water meter needs to be purchased with TPU. Power installed. Sewer stubbed and connected to the main, but a grinder pump (with a tank), needs to be installed. Great opportunity to build your dream home close to everything you need!